Every service call backed with video proof

Talk through the job while you do it. Blue builds the service summary in your format, with photos and recommendations, for you to review before you’re back in the truck.

Your troubleshooting goes straight into the write-up

Work the problem with Blue. Every check you talk through and every answer from your manuals stays with the job, and you decide what goes into the write-up.

Service recommendations the office can quote

Call out the worn belt or the aging unit while you’re standing in front of it. Each recommendation goes on the work order with its photo and part number for the office to follow up.

Tell the story. Blue writes it up.

Talk through the job while you work and the write-up is done before you’re back in the truck. Blue writes complaint, cause and correction or your company’s format, with before and after photos. Read it, fix anything, then paste or sync it to the work order.

“Everything I know gets captured just by doing the job. Airwave makes sure it’s there for the next guy.”

United RentalsKeiphun SowellSenior Technician, United Rentals

York chiller service summary

200 Commerce Tower · Meridian Commercial Properties

AirwaveSample report

York chiller Service summary

Meridian Commercial Properties

Site
200 Commerce Tower, Mech Room B
Equipment
York YVAA0057 · Floors 1–3
Technician
Jason Rivera, ACS
Date
April 3, 2026

Work performed

Upon arrival, we identified a high discharge pressure alarm on the York YVAA0057 chiller serving floors 1–3. Inspection of the condenser revealed significant mineral scale buildup in the condenser tubes, traced to the cooling tower loop. We performed a full chemical descale treatment on the condenser barrel, flushed the cooling tower loop, and replaced the Y-strainer basket, which was approximately 60% blocked with sediment. Following service, the system was restored to full operation and confirmed stable under full load prior to departure. No further issues were identified at the time of service.

Service timeline

  1. Arrived Mechanical Room B. High discharge pressure alarm on the York YVAA0057 with reading of 285 PSI.

    Arrival footage from the published chiller sample
  2. Significant mineral scale buildup in the condenser tubes traced to the cooling tower loop. Beginning chemical descale.

    Condenser footage from the published chiller sample
  3. Flushed cooling tower loop and replaced Y-strainer basket blocked at approximately 60%.

    Service footage from the published chiller sample
  4. System restored to full load and confirmed stable. Discharge pressure 210 PSI. No further issues.

    Completion footage from the published chiller sample

Recommendations

Schedule quarterly condenser cleaning. Monitor Y-strainer basket at next PM. Consider water treatment review for cooling tower loop.

Airwave service demo · 0:32

How Jobs work

Everything from the call stays in one job: voice notes, photos, recordings and Blue's answers. Pick it back up by voice, even after a quiet stretch.

The full Jobs page is still to come.

See how Blue keeps track